Remodel Status

The renovation of The Studio has been a community effort. Many people have donated their time, skills, materials and labor. We are almost finished. In fact, the space is in full use. There are however, some tasks remaining. Here is a list.

Projects

  1. Exterior Trim – We need people to help complete the exterior trim around the doors and windows. We have all of the wood.
  2. Concrete patios – we will pour concrete patios in front and back. They need to be sloped properly for drainage.
  3. Gutters – We need to have gutters installed in the front and back of the building. This might involve hiring a company to do the project.
  4. Bathroom grab bars – we need two 42″ grab bars to be installed in the bathroom
  5. Toilet – We would like an ADA compliant toilet for the bathroom. Need to purchase it and install.
  6. Sink (bathroom) – We need an ADA compliant bathroom sink installed in the bathroom.
  7. Kitchen
    • Utility sink
    • Stainless steel counters
    • Range (electric oven and stove)

Leave a Reply

Your email address will not be published. Required fields are marked *